top of page
LATEST BLOGS


Crank Pin Ovality: How to Check It and What It Means | MEO Class 4
Master crank pin ovality for MEO Class 4 with this complete guide covering causes, measurement, ovality vs taper, allowable limits, inspection procedures, and bearing damage.

DMET Cadets
Aug 276 min read


Comprehensive Dry Dock Checklist: Preparations Before Dry Dock
Dry docking is a vital maintenance phase for ships, where the vessel is taken out of the water to inspect, clean, repair, and maintain various components. For this process to be efficient and effective, meticulous planning is required. This detailed checklist will guide shipowners, crew, and ship managers through all the essential steps to ensure a successful dry dock period. Some Drydock Images Below: Courtesy: Five Stars Shipping 1. Review Items for Class Survey The first a

Team MarineX
Oct 18, 20246 min read
bottom of page